Contact us
|
|||
|
Product Description
- The material is aviation aluminum,not easy to be bended or cut.
- With very light weight , only 2.5 kg
- All gaps are connecting with TIG welding.
- Mesh sieve is made by steel bar(diameter:6mm).Hand-made and TIG welding
- TIG welding will use 36 processes for each gold mining pan
- Each pan will cost 6 hours of labor input.
- Guarantee 5 years
The professional gold mining pan is designed for professional prospecting and commercial operation.It can recover gold with high speed and efficiency.
Packing size :520*320*250mm Weight :3 kg
Steel Gold pan Work Steps:
The first step: Put into the water
Step one: Put the pan into water,the water will fill up from down to up,the sand will float and the heavy metal will be sinking.the water from outside only goes into the lower part.
The second step: Cleaning materials
Step two: This step will cost 5-10s. The time depends on the proportion of clay.in this step the heavy materials and the gold will be separated.
The third step : Discharge tailing
Step three: Uplift the pan slowly,shaking lightly.Sand float and the fine stuff will be sinking into pan’s bottom.the density of gold is more bigger,they are sinking ,after that we only need to clean the extra ston-es in the pan.
![]() |
Qingzhou Julong Environment Technology Co., Ltd Address: Julong Industry Park, Qingzhou City, China Hot service: +86-536-3837236/3836888 Phone: +86 186 636 33168 +86 186 636 22100 Email: info@trust-sun.com |